Tru Blu installation & ownership guide

Delivery and handling

Arrange third-party freight and safe unloading before the pool leaves production.

Use this guide with the installation detail and equipment manuals supplied with your pool. Your site approval sets the required inspections.

1. Get an accurate delivery quote

  1. Provide suburb, postcode, driveway and access photos, gate widths, turning space and overhead clearance. Tell us about steep access, soft ground or restricted vehicle access.
  2. Delivery is quoted separately through a third-party carrier. Confirm what the quote includes: transport, unloading, lifting and final positioning can be separate services.

2. Arrange placement equipment

  1. A crane or another suitable lifting method may be needed where the shell cannot reach the foundation directly. Confirm lift planning with the handling provider.
  2. Use the handling instructions supplied for your shell. Do not lift from the rolled edge, pipework, skimmer or light fitting.

3. Receive the pool

  1. Keep the unloading and placement areas clear. Have the foundation ready and prevent children from entering the work area.
  2. Check shell condition and every equipment carton against the packing list. Photograph damage and note it with the carrier before signing where possible.

4. Report problems

  1. Email photographs, order number and delivery details promptly if an item is damaged or missing. Retain relevant packaging.
  2. Resolve damage or support concerns before installation continues. Consumer rights apply independently of carrier paperwork.

Illustrated installation manual

Work through the drawings and job checks below, or download the same sequence as a PDF. Open a drawing to zoom into its labels.

01Your installation sequence

Your installation sequence: installation diagram; read the accompanying steps for the construction detail
Functional illustration. Use the dimensions and assembly details identified in the accompanying instructions.
  1. Choose the pool position, fittings orientation and equipment location together. Draw the barrier and gate on the same plan.
  2. Arrange the approval pathway and inspection schedule. Eligible NSW projects may use a CDC through a registered independent certifier or council; we can advise upon purchase.
  3. Locate buried services and overhead hazards. Keep excavation and delivery routes clear of them.
  4. Prepare the foundation and drainage; place the shell; connect equipment; arrange licensed electrical work; complete barriers and commissioning.

Site diagram is a planning aid. It does not establish setbacks or barrier dimensions.

02Mark the footprint

Mark the footprint: installation diagram; read the accompanying steps for the construction detail
Functional illustration. Use the dimensions and assembly details identified in the accompanying instructions.
  1. Set a centre peg and mark the shell circle using a radius of D / 2. Check the chosen diameter against your order.
  2. Mark a second circle for the full supporting foundation: outside diameter D + 2E. E is the edge extension in the foundation detail for this installation.
  3. Set finished base height with a laser and reference peg that will remain visible during excavation and compaction.
  4. Mark the fittings side before placement so the pipe routes are short, accessible and clear of the barrier.
PoolDRadiusFoundation diameter
Compact2,200 mm1,100 mm2,200 + 2E mm
Classic2,800 mm1,400 mm2,800 + 2E mm
Family3,400 mm1,700 mm3,400 + 2E mm

D is the ordered shell diameter. E and base depth T are construction dimensions from the foundation detail.

03Construct a compacted granular base

Construct a compacted granular base: installation diagram; read the accompanying steps for the construction detail
Functional illustration. Use the dimensions and assembly details identified in the accompanying instructions.
  1. Strip grass, roots, organic topsoil and soft pockets. Establish firm formation across the whole marked footprint.
  2. Place the specified granular material in manageable layers. Moisture-condition and compact each layer with suitable equipment; do not compact only the top of a loose heap.
  3. Trim the finished surface flat and level. Check several crossing directions with the laser or straightedge, including the perimeter.
  4. Retain the outside edge so rainfall and splash water cannot erode the base. Keep the retaining edge outside the shell bearing line.
  5. Remove sharp protrusions, debris and isolated high spots before placement. Photograph the finished base.
Job check / record
  • Foundation material / depth T
  • Edge extension E
  • Finished base level
  • Level check results / date

The prototype site drawing used a 100 mm compacted DGB20 road-base layer. That is a site example, not a universal slab or soil specification.

04Concrete, runoff & services

Concrete, runoff & services: installation diagram; read the accompanying steps for the construction detail
Functional illustration. Use the dimensions and assembly details identified in the accompanying instructions.
  1. Where the site detail specifies a reinforced slab, set its size, reinforcement, thickness, cover and curing sequence before the pour. Keep the bearing surface level.
  2. Slope surrounding ground and paths away from the level pool base. Divert downpipes and uphill runoff so they do not discharge beneath it.
  3. Locate the equipment on a stable, drained pad. Keep pump lids, filter cartridges, UV lamps, valves and electrical isolation accessible.
  4. Route trenches outside the supporting footprint unless the construction detail provides for them. Reinstate and compact disturbed ground.
Job check / record
  • Drainage route / discharge point
  • Equipment pad location
  • Pipe route / trench record

A drainage slope belongs around the foundation, not across the pool bearing surface.

05Delivery, unloading & placement

Delivery, unloading & placement: installation diagram; read the accompanying steps for the construction detail
Functional illustration. Use the dimensions and assembly details identified in the accompanying instructions.
  1. Measure the narrowest gate, path, overhead opening and turning area. Send photographs and measurements when arranging freight.
  2. Agree the vehicle position, unloading responsibility and lifting method with the carrier before dispatch. Book lifting services separately where required.
  3. Inspect packaging and shell on arrival; record visible damage before accepting handover. Keep all handling equipment away from the rolled edge and fittings.
  4. Lift and place using the agreed handling method. Do not drag the shell over rough ground or use pipe fittings as handles.
  5. Orient the fittings, then check complete base contact and level. Correct the base while the shell is empty; do not pack isolated supports underneath.
Job check / record
  • Narrowest access width / height
  • Carrier / unloading method
  • Placement level check
  • Delivery condition / photographs

Shell weight and lifting attachment locations are delivery-specific. The rolled edge is not a lifting point.

Manufacturer instructions & references

Keep the instructions for your exact supplied model with this guide.

NSW pool approval pathways ↗

Completion checklist

Help when you need it.

Installing the kit yourself or coordinating trades? Send your order number, photographs and the step you need help with.

contact@trublupools.com.au ↗